Research Article
A Weak-Coupling Flow-Power Forecasting Method for Small Hydropower Station Group
Table 5
Comparison of the 24-hour-ahead prediction performance of two power prediction methods.
| | Basin | 24 h-ahead prediction | 120 h-ahead prediction | NRMSE | MAPE (%) | NRMSE | MAPE (%) |
| Traditional method | 1 | 0.18 | 17.08 | 0.26 | 34.57 | 2 | 0.07 | 2.58 | 0.09 | 6.87 | 3 | 0.11 | 13.15 | 0.26 | 21.56 |
| Our method | 1 | 0.13 | 12.23 | 0.24 | 29.15 | 2 | 0.04 | 2.00 | 0.07 | 5.01 | 3 | 0.08 | 6.73 | 0.17 | 12.02 |
|
|