Research Article
The Optimal Development Strategy Selected for Layered Sandstone Reservoir by Creating a System Economic Model
① System Economic model ⟶ The production layer cumulative production limit | ② The arc-tangent method forcast water cut ⟶ | ③ Economical ultimate water cut model ⟶ EUWC | ④ D-type water drive rule curve method ⟶ of planned upper layer production time to EUWC time | ⑤ to decide target layer development method |
|