Research Article

The Optimal Development Strategy Selected for Layered Sandstone Reservoir by Creating a System Economic Model

Table 5

Water cut and cumulative oil production of block S.

Month numberTime (month)Actual water cut (%)Prediction water cut (%)Relative error (%)Actual cumulative oil production (104 t)Actual cumulative water production (104 t)Actual cumulative liquid production (104 t)/Prediction cumulative oil production (104 t)Relative error (%)

6820181096.6796.64-0.033202.942801.913004.8514.81202.79-0.07
6920181196.7696.70-0.058204.892860.303065.2014.96204.68-0.10
7020181296.8796.77-0.105206.972924.713131.6915.13206.52-0.22
7120190197.0196.83-0.186208.822984.833193.6515.29208.31-0.25
7220190296.9896.89-0.095210.583041.233251.8015.44210.04-0.25
7320190396.9896.95-0.036212.553104.593317.1515.61211.72-0.39
7420190497.0097.000.000214.523168.213382.7415.77213.36-0.54
7520190596.9797.050.086216.593234.303450.8915.93214.95-0.76
7620190697.0297.100.087218.483295.953514.4416.09216.50-0.91
7720190797.0797.150.086220.453360.893581.3316.25218.01-1.11
7820190897.20219.48
7920190997.25220.91
8020191097.29222.30
8120191197.34223.67
………………
11620221098.29256.94
11720221198.31257.61
11820221298.32258.28
………………
17320270798.92284.11
17420270898.93284.45
17520270998.93284.78
17620271098.94285.11