Research Article
A Novel Energy-Efficient Transmission System and Control Strategy for Hydraulic Machines
Table 4
Components of the power system and scheduling scheme in different operations.
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
A/B (−12/12, et al.): B and A represent the total number of components and the number of components used in this stage, respectively. +: restore energy. −: release energy. |