Research Article
Optimal Sizing of Hybrid Renewable Energy System Using Two-Stage Stochastic Programming
Table 12
Optimal power plant sizing based on the expected data.
| | Power plant | Size in GW using Monte Carlo | Size in GW using ADMM |
| | Gas turbine | 1.78 | 1.7791 | | Coal | 3.23 | 3.2286 | | Nuclear | 4.07 | 4.0669 | | Hydroelectric | 5.00 | 4.9937 | | Cost (billion $) | | |
|
|