Optimal Sizing of Hybrid Renewable Energy System Using Two-Stage Stochastic Programming
Table 2
Capital cost per kW capacity [
48ā
51].
| | Plant | Cost per kW in $ () |
| | Solar | 3000 | | Wind turbine | 1300 | | Fuel cell and electrolyzer | 1700 | | Batteries | 1500 |
|
|