Research Article

Optimal Sizing of Hybrid Renewable Energy System Using Two-Stage Stochastic Programming

Table 6

Operation cost of power generation.

PlantCost $/kWh ()

Solar0.060
Wind turbine0.015
Fuel cell and electrolyzer0.025
Backup batteries0.150

Solar plant and wind turbine operating costs are expected values.