Research Article

Optimal Sizing of Hybrid Renewable Energy System Using Two-Stage Stochastic Programming

Table 7

Optimal power plant that supply the load of Ga-Nkoana using ADMM and PH.

PlantOptimal decision using ADMMOptimal decision using PH

Solar PV19.31 kW21.25 kW
Wind turbine10.83 kW8.72 kW
Fuel cell8.84 kW11.53 kW
Batteries9.30 kWh10.22 kWh
Capital cost ($)101020110 000
Operating cost ($)1667915921
Total cost ($)117699125921