Detailed output for different components of the WT/DG/BS system.

QuantityValueUnitQuantityValueUnit

Wind turbine
Total rated capacity90.0kWMaximum output47.6kW
Mean output12.2kWWind penetration48.8%
Capacity factor13.5%Hours of operation3,377hrs/yr
Total production106,783kWh/yrLevelized cost0.209$/kWh
Diesel generator
Hours of operation4,791hrs/yrElectrical production119,068kWh/yr
Number of starts992starts/yrMean electrical output24.9kW
Operational life3.13yrMinimum electrical output6.25kW
Capacity factor54.4%Maximum electrical output25.0kW
Fixed generation cost2.41$/hrSpecific fuel consumption0.306L/kWh
Marginal generation cost0.273$/kWhFuel energy input358,747kWh/yr
Fuel consumption36,458LMean electrical efficiency33.2%
Battery storage
Autonomy4.03hrBatteries48.0qty.
Storage wear cost0.221$/kWhEnergy in25,255kWh/yr
Nominal capacity126kWhEnergy out21,478kWh/yr
Usable nominal capacity101kWhStorage depletion12.0kWh/yr
Lifetime throughput109,685kWhLosses3,789kWh/yr
Expected life4.71yrAnnual throughput23,296kWh/yr
Converter
Hours of operation1,6082,382Energy in21,47826,585
Energy out20,40425,255Losses1,0741,329