Thermoeconomic Analysis of a Solar-Assisted Industrial Process Heating System
Table 2
Parameters and assumptions for economic analysis.
| Input parameters | System | PVT | FPC | HPETC |
| Total capital cost with DC water heater (RM per m2) | 2714 | 2613 | 2814 | Total operation and maintenance costs (RM per m2) | 150 | 125 | 150 | Interest rate (%) | 14 | Discount rate (%) | 8 | Incremental cost/year (%) | 3 | Electricity price (RM/kWh) (TNB tariff) | 0.365 | Plant life period (year) | 20 | Other revenue income | CERs from CDM: Global high scenario (80 USD per ton) Global low scenario (40 USD per ton) | Degradation rate | 5% |
|
|
Note: 1 USD is taken as 4.27 MYR during the conduct of this research study.
|