Research Article
Two-Layer Optimization Method for Sharing Energy Storage and Energy considering Subjectivity
Table 8
Technical and financial parameters of DGS components.
| Parameter | Unit | Value |
| Wind turbine [54] | | | Hub height | m | 37 | Cut-in wind speed | m/s | 3 | Cut-out wind speed | m/s | 25 | Rated wind speed | m/s | 15 | Extreme wind speed | m/s | 59.5 | Lifetime | yrs | 20 | Photovoltaic panels [24, 55] | | | Derating factor [24] | — | 0.88 | Lifetime | yrs | 20 | Lithium-ion battery ESS | | | Round trip efficiency [56] | % | 90 | Depth of discharge [57] | % | 90 | Lifetime [24] | yrs | 10 | Capital cost | US $/kWh | 330 | O&M cost | US $/kWh | 0.015 | Public grid | | | The CO2 emission factor of the power | g/kWh | 800 | Feed-in tariff | US $/kWh | 0.04 | Energy community | | | Management fee | US $/kWh | 0.006 | Transmission cost [58] | US $/kWh | 0.003 |
|
|