Research Article

A Blocking Method for Overload-Dominant Cascading Failures in Power Grid Based on Source and Load Collaborative Regulation

Table 5

Comparison of grid status before and after AGO and COL.
(a) The case with the lowest value

Initial faultOver limit lineCutting machine load capacity after AGO and COL before AGO and COL after AGO and COL

[10, 15][9, 19, 23][642, 250, 632, 540, 276, 234, 318, 500]284602.97002.729085
[33, 46][6, 8, 23][249, 650, 540, 630, 309, 355, 115, 231, 522]227405.13413.659189
[39, 46][8][647, 250, 540, 368, 319, 522]151504.38043.518708
[14, 25][3, 6][249, 540, 998, 631, 223, 321, 157, 355]165601.98001.923736

(b) The case with the lowest value

Initial faultOver limit lineCutting machine load capacity after AGO and COL before AGO and COL after AGO and COL

[10, 15][9, 19, 23][642, 250, 632, 540, 30, 234, 316, 514]540802.97000
[33, 46][6, 8, 23][249, 627, 540, 629, 50, 155, 9, 231, 520]898705.13410
[39, 46][8][641, 250, 540, 117, 2, 522]813404.38040
[14, 25][3, 6][249, 540, 998, 631, 223, 301, 151, 102]474501.98000