Research Article

Intelligent Collaborative Optimal Scheduling for Water Intake-Supply Pump Groups in Drinking Water Treatment Plants

Table 3

Specific electric energy consumption and efficiency of actual scheduling plan and optimal scheduling plan in the water intake-supply pump groups on 7 consecutive days.

DaySpecific electric energy consumption (kWh/103 m3)Average efficiency (%)
ActualOptimalActualOptimal

Day 1106.5697.8072.2488.61
Day 2105.2199.5872.5487.57
Day 3110.20100.4172.0386.10
Day 4116.47102.3072.8784.36
Day 5128.14104.1971.5090.84
Day 6111.79101.8773.1889.83
Day 7112.32100.6073.5986.38