Research Article
Risk-Adjusted Control Charts for Health Care Monitoring
| (1) Before the monitoring phase starts, take the following preliminary steps: | | (a) Select a desired and a degree of change during that | | should be optimally protected against. | | (b) Apply rule of thumb (2.2) to obtain (typically truncate at 5 in practice). | | (c) Find such that , where is Poission, or simply use its | | approximation from (A.2). | | (d) Wait till failures have occurred. Take for example, (or use Section 4 | | (e.g., see (D.6)) to make a more elaborate choice). | | (e) From this Phase I sample, evaluate the fraction of failures for each of the | | categories . | | (2) Now wait till , the moment at which the failure occurs. | | (3) Obtain the corresponding numbers from category (i.e., ). | | (4) Give a signal if ; otherwise go back to Step 2, leading to . |
|