Research Article
Energy Storage Requirements for PV Power Ramp Rate Control in Northern Europe
Figure 9
Output power of the 0.55 MWp PV generator, grid feed-in power, and the absolute power of ESS during the formation of the maximum ESS power requirement on 08.09.2012 while complying with RR limit of 1%/min.