Research Article

Uncertainty Analysis of Energy Production for a 3 × 50 MW AC Photovoltaic Project Based on Solar Resources

Table 10

The uncertainty figures considered for the project.

PV plant
Simulation uncertainty (%)Solar resource uncertainty (%)

6.4%6.1%

Future variability (%)Total uncertainty (%)
1 year10 years1 year10 years
3.4%1.1%9.5%8.9%