Uncertainty Analysis of Energy Production for a 3 × 50 MW AC Photovoltaic Project Based on Solar Resources
Table 10
The uncertainty figures considered for the project.
| PV plant | Simulation uncertainty (%) | Solar resource uncertainty (%) |
| 6.4% | 6.1% |
| Future variability (%) | Total uncertainty (%) | 1 year | 10 years | 1 year | 10 years | 3.4% | 1.1% | 9.5% | 8.9% |
|
|