Research Article

Critical Demand Response Opportunities in Heavy Industries as a Solution for Large Active Power Imbalance in Smart Grid: Study in Three Industrial Subgroups

Table 4

The results of the CDR program on the 7th of Aug.

CustomerLoad consumption at the beginning of the CDR (13 : 48)—(MW)Load consumption at the moment of AUFLS performance (14 : 01)—(MW)Load reduction amount (MW)Percentage of load reduction (%)

Cement plant58.2537.8520.435.02
Pulp and paper factory74.5866.278.3111.14
MDF mill4.823.711.1123.03
Total137.65107.8329.8221.66