Research Article
[Retracted] Optimisation of Working Line Length during the Period of Gently Inclined Slope in Tilted Coal Seam Open-Pit Mine
Figure 5
Schematic diagram of the location and morphology of the I-I section at the location of the transitional retention trench in the mining area.