Research Article

[Retracted] Optimisation of Working Line Length during the Period of Gently Inclined Slope in Tilted Coal Seam Open-Pit Mine

Table 2

The relationship between the inner row space and the width and level of the groove.

ProjectsLength of retention trenchRetained ditch level

Mining status L0Coal seam
Mining status L0L L
Minimum is b
Note