Research Article
Probabilistic Quantification of Distribution System Resilience for an Extreme Event
Figure 12
Active distribution lines during the extreme event (phases I, II, and III) for different scenarios in case I: (a) without tie-line switches and DGs and (b) with tie-line switches and DGs.
(a) |
(b) |