Research Article
Multi-Time Scale Rolling Optimization Scheduling of “Nealy-Zero Carbon Park” Based on Stepped Carbon Allowance Trading
Table 1
The operating parameters of each equipment.
| Equipment | Parameter | Numerical value |
| Waste pyrolysis gasification power generation facility | Amount of garbage handled | 40 | Rated power | 30 | Manure treatment facility | The amount of manure treated | 40 | P2G | Electric to gas efficiency | 0.7 | Output climbing upper and lower limit | 10/0 | EB | Electricity to heat efficiency | 0.6 | Output climbing upper and lower limit | 10/0 | Electricity storage device | Maximum charge and discharge power | 25/25 | Charge/discharge factor | 0.9/0.9 | Heat storage device | Maximum charge and discharge power | 10/10 | Charge/discharge factor | 0.9/0.9 | Gas storage device | Maximum charge and discharge power | 4/4 | Charge/discharge factor | 0.9/0.9 |
|
|