Multi-Time Scale Rolling Optimization Scheduling of “Nealy-Zero Carbon Park” Based on Stepped Carbon Allowance Trading

Table 1

The operating parameters of each equipment.

EquipmentParameterNumerical value

Waste pyrolysis gasification power generation facilityAmount of garbage handled40
Rated power30
Manure treatment facilityThe amount of manure treated40
P2GElectric to gas efficiency0.7
Output climbing upper and lower limit10/0
EBElectricity to heat efficiency0.6
Output climbing upper and lower limit10/0
Electricity storage deviceMaximum charge and discharge power25/25
Charge/discharge factor0.9/0.9
Heat storage deviceMaximum charge and discharge power10/10
Charge/discharge factor0.9/0.9
Gas storage deviceMaximum charge and discharge power4/4
Charge/discharge factor0.9/0.9