Research Article
Optimal Recloser Placement in Distribution System Considering Maneuver Points, Practical Limitations, and Recloser Malfunction
Table 4
General parameters of real test system.
| Feeder | Total load (MWh) | Industrial | Commercial | Residential | Total costumers | Length (Km) |
| F1 | 3.353 | 28 | 516 | 800 | 1344 | 9.54 | F2 | 6.18 | 8 | 946 | 1310 | 2348 | 9.402 | F3 | 12.50 | 10 | 214 | 3094 | 4563 | 80 | F4 | 5.25 | 4 | 7683 | 2479 | 2897 | 91 | Total | 27.28 | 50 | 1735 | 7683 | 11152 | 189.94 |
|
|