Optimal Load Distribution in DG Sources Using Model Predictive Control and the State Feedback Controller for Switching Control

Table 1

The numerical results of the joint load sharing by the distributed generation source by selecting optimal parameters using the LQR controller (employing the PSO method).

Active powerInitialIntermediate amount, MW(in the islanding mode)Final amountRecovery time (second)
Amount (MW)(MW)(After reconnecting the grid)

Figure 7PL11.111.10.01
PG10.88−0.150.880.02
P10.221.150.220.02
PL21.10.971.10.01
PG20.55−0.30.550.02
P20.551.270.550.02

Figure 8Voltage drop
In PCC2% in PCC1%
2.7% 3.1%