Optimal Load Distribution in DG Sources Using Model Predictive Control and the State Feedback Controller for Switching Control

Table 3

The numerical results of the islanding mode in the presence of a PID controller (using the PSO method) and a distributed generation source.

Active powerInitial amount (MW)Intermediate amount (in the islanding mode) (MW)Final amount (MW)Recovery time (second) after reconnecting the grid (CB-1)

Figure 11PL10.70.640.70.03
PG10.63−0.140.630.03
P10.070.760.070.04

Figure 12Voltage dropVoltage range, KV
(%) PPC1Initial amountIntermediate amount (in the islanding mode)
2.5%54.89