The numerical results for the islanding mode in the presence of the proposed DE-MPC controller.
| | Active power | Initial amount (MW) | Intermediate amount (in the islanding mode) (MW) | Final amount (MW) | Recovery time (second) after reconnecting the grid (CB-1) |
| Figure 14 | PL1 | 0.7 | 0.68 | 0.7 | 0.02 | PG1 | 0.63 | −0.12 | 0.63 | 0.02 | P1 | 0.07 | 0.71 | 0.07 | 0.03 | | Voltage drop | Voltage range, KV | | (%) PPC1 | Initial amount | Intermediate amount (in the islanding mode) | Proposed DE-MPC Figure 15 | | 2.1% | 5 | 4.89 | FS-MPC | | 2.7% | 5 | 4.85 | DSVM-MPC | | 2.5% | 5 | 4.87 | PL1 curve | OV% | Rise time | Settling time | PID | 3% | 0.08s | 0.25s | Proposed DE-MPC | 0 | 0.05s | 0.1 s |
|
|