Hierarchical Scheduling Control Method for Cascade Hydro-PV-Pumped Storage Generation System

Table 1

Operating parameters of the power stations.

Generation stationInstalled capacity (MW)Number of unitsAbility of reservoir capacity adjustmentUpper reservoir capacity (initial reservoir) (10^4 m3)Hydraulic head (initial hydraulic head) (m)Generation flow (m3)

First level453Daily regulation30.1 (15.5)112.8–134.5 (117.4)43.32
Second level603Daily regulation96.1 (83.6)125.5–156.5 (140.2)53.4
Third level CH363Daily regulation70 (53)91–130 (123.3)33
PS51Daily regulation25.6100
PV501