Hierarchical Scheduling Control Method for Cascade Hydro-PV-Pumped Storage Generation System
Table 1
Operating parameters of the power stations.
| | Generation station | Installed capacity (MW) | Number of units | Ability of reservoir capacity adjustment | Upper reservoir capacity (initial reservoir) (10^4 m3) | Hydraulic head (initial hydraulic head) (m) | Generation flow (m3) |
| | First level | 45 | 3 | Daily regulation | 30.1 (15.5) | 112.8–134.5 (117.4) | 43.32 | | Second level | 60 | 3 | Daily regulation | 96.1 (83.6) | 125.5–156.5 (140.2) | 53.4 | | Third level CH | 36 | 3 | Daily regulation | 70 (53) | 91–130 (123.3) | 33 | | PS | 5 | 1 | Daily regulation | 25.6 | 100 | — | | PV | 50 | 1 | — | — | — | — |
|
|