Research Article

[Retracted] Model-Predicted Control System for the Real-Time Operation of an Urban Drainage System to Mitigate Urban Flood Risk: A Case Study in the Liede River Catchment, Guangzhou, China

Figure 1

Study area. (a) Location of Guangzhou City in China, (b) location of the Liede River Basin in Tianhe District of Guangzhou City, and (c) Liede River catchment.
(a)
(b)
(c)