Research Article
[Retracted] Model-Predicted Control System for the Real-Time Operation of an Urban Drainage System to Mitigate Urban Flood Risk: A Case Study in the Liede River Catchment, Guangzhou, China
Figure 5
Modeled and measured water-level value for calibration of the UDS model on the (a) 20180505, (b) 20180507, (c) 20180511, (d) 20180513, (e) 20180515, and (f) 20180524 rainfall events.
(a) |
(b) |
(c) |
(d) |
(e) |
(f) |