Research Article
[Retracted] Model-Predicted Control System for the Real-Time Operation of an Urban Drainage System to Mitigate Urban Flood Risk: A Case Study in the Liede River Catchment, Guangzhou, China
Figure 6
Modeled and measured water level in node J41. Events of (a) 09/04/2018 (NSE = 0.890) and (b) 21/05/2018 (NSE = 0.906).
(a) |
(b) |