Research Article
[Retracted] Model-Predicted Control System for the Real-Time Operation of an Urban Drainage System to Mitigate Urban Flood Risk: A Case Study in the Liede River Catchment, Guangzhou, China
Table 2
The control rules of the original control scenario (the location and number of gates are in accordance with Figure 10).
|