Research Article

[Retracted] Model-Predicted Control System for the Real-Time Operation of an Urban Drainage System to Mitigate Urban Flood Risk: A Case Study in the Liede River Catchment, Guangzhou, China

Table 2

The control rules of the original control scenario (the location and number of gates are in accordance with Figure 10).

 R1R2R3R4R5R6R7

Gate height (m)3.03.02.03.03.02.03.0
Gate-on (m)3.02.11.82.83.01.23.0
Gate-off (m)1.90.91.72.42.51.02.7