Research Article
Effect of Demand Response Programs on Industrial Specific Energy Consumption: Study at Three Cement Plants
Table 7
Power consumption saving and solutions in cement plants after energy audit under the influence of TOU program.
| Solutions | Power consumption saving (kw) |
| Put variable speed controller (VSD) on material mill fan | 4378.218 | Use intelligent power controllers (power boss) | 41.316 | Use star-triangle controllers | 18.37 | Use elevator bucket instead of material transfer airlift | 348.94 | Total | 4786.844 |
|
|