Research Article
A Fast Holomorphic Embedding Power Flow Approach for Meshed Distribution Networks
Table 1
Initial loading levels and number of loops.
| Test case | Initial loading levels (MW) | Number of loops |
| 18 | 11.6 | 0 | 33 | 37.2 | 5 | 69 | 38 | 11 | 141 | 119 | 0 | 3239 | 62.5 | 5 | 5701 | 74.4 | 0 | 6921 | 28.4 | 9 |
|
|