Research Article
A Novel Design, Economic Assessment, and Fuzzy-Based Technical Validation of an Islanded Microgrid: A Case Study on Load Model of Kibber Village in Himachal Pradesh
Figure 9
Implementation assessment results. (a) Ideal conditions: L1, L2, L3, and L4 are ON indicating 100% load fulfillment. (b) Nonideal conditions: L4 is ON, indicating only 25% load fulfillment. (c) PLC ladder logic window.
(a) |
(b) |
(c) |