A Novel Design, Economic Assessment, and Fuzzy-Based Technical Validation of an Islanded Microgrid: A Case Study on Load Model of Kibber Village in Himachal Pradesh
Table 2
Tabulated summary of proposed work.
System design
Location
Assessment aspects
Remarks
Proposed work
Kibber village, Himachal Pradesh, India
(1) Techno-economic feasibility (2) Technical assessment using simulations (3) Feasibility analysis using PLC-based hardware test bench
(1) HOMER Pro software is used to plan islanded residential MG systems equipped with renewable energy resources per the load demand (2) Economic analysis of various parameters based on system architecture, costs, and system components is performed (3) MG is planned using MATLAB–Simulink software under various uncertain conditions and technically assessed (4) Feasibility and implementation assessment of proposed MG using PLC-based robust controller and developed hardware test bench