Research Article

A Novel Design, Economic Assessment, and Fuzzy-Based Technical Validation of an Islanded Microgrid: A Case Study on Load Model of Kibber Village in Himachal Pradesh

Table 6

Tabulated data for power converter.

ParameterValue

TypeAC-DC-AC
Capital cost ($)600
Lifetime (years)18
Replacement cost ($)350
O&M cost ($)5/year
Efficiency95%