International Transactions on Electrical Energy Systems / 2022 / Article / Tab 9 / Research Article
A Novel Design, Economic Assessment, and Fuzzy-Based Technical Validation of an Islanded Microgrid: A Case Study on Load Model of Kibber Village in Himachal Pradesh Table 9 Comparison of the different optimized configurations.
Sr. No. Classification Parameter Configuration PV + battery PV + wind + battery Wind + battery 1. Architecture Architecture/CS6K-290MS (kW) 54 47.25 — 2. Architecture/G10 0 1 13 3. Architecture/Dis12 V 183 177 213 4. Architecture/Converter (kW) 25.729 26.916 24.657 5. Architecture/Dispatch CC CC CC 6. Cost Cost/COE ($) 0.127 0.171 0.277 7. Cost/NPC ($) 248966.1 282958.1 818979.3 8. Cost/Operating cost ($/yr) 3749.477 4148.756 10867.12 9. Cost/Initial capital ($) 20049.6 229325 678494.4 10. Cost/Fuel cost ($/yr) 0 0 0 11. Cost/o&M ($/yr) 2952.503 3123.583 6814.287 12. CS6K-290MS/Capital cost ($) 111857.1 97875 — 13. G10/Capital cost ($) — 44500 578500 14. G10/o&M cost ($) — 400 5200 15. System component (s) System/Ren frac (%) 100 100 100 16. System/Total fuel (L/yr) 0 0 0 17. System/Cap short (%) 0.09759784 0.000764332 0.0985902 18. System/Excess elec (%) 36.56232 39.48045 66.7873 19. System/Unmet load (%) 0.02102028 2.20E-15 0.05702304 20. System/Unmet load (kWh/yr) 12.37111 1.29E-12 33.55989 21. System/CO2 (kg/yr) 0 0 0 22. CS6K-290MS/Production (kWh/yr) 104196.7 91172.15 — 23. G10/Production (kWh/yr) — 15099.26 196290.4 24. Dis12 V/Autonomy (hr) 67.86707 65.64193 78.99283 25. Dis12 V/Annual throughput (kWh/yr) 19737.41 13697.71 19485.57 26. Dis12 V/Nominal capacity (kWh) 569.9479 551.2612 663.3821 27. Dis12 V/Useable nominal capacity (kWh) 455.9584 441.0089 530.7056