Research Article
Performance Analysis of Bus Voltage in Distribution Network with High Penetration of PV Controlled via Data-Driven Approach
Table 1
Change in power; S (kVA), P (kW), and Q (kVAR) supplied by the grid with changes in system loads.
| Load condition/grid power | With VVC | With VWC | P | Q | S | P | Q | S |
| Base load | 2449.0 | 3043.0 | 3906.0 | 2447.0 | 3037.0 | 3900.0 | +5% increment at all | 2539.0 | 3109.0 | 4014.0 | 2531.0 | 3101.0 | 4002.0 | +10% increment at all | 2629.0 | 3177.0 | 4123.0 | 2629.0 | 3176.0 | 4123.0 | −5% increment at all | 2359.0 | 2975.0 | 3797.0 | 2361.0 | 2974.0 | 3797.0 | −10% increment at all | 2268.0 | 2909.0 | 3688.0 | 2256.0 | 2910.0 | 3682.0 | +5% at bus 671 and −10% at bus 634 | 2468.0 | 3051.0 | 3924.0 | 2468.0 | 3050.0 | 3924.0 |
|
|