Research Article
Resilient Operation of Electric Vehicles considering Grid Resiliency and Uncertainties
Table 6
The results of objective functions for scenario 1 and scenario 2, ref. [
38], and double penetration.
| Scenario | 1 | 2 | Ref. [38] | Double penetration |
| Profits of peak load reduction ($) | 2.78 × | 2.11 × | 2.42 × | 2.35 × | Profits of resiliency enhancement ($) | 4.45 × | 6.18 × | 5.31 × | 6.41 × | Profits of providing demand ($) | 3.94 × | 4.01 × | 3.98 × | 4.02 × | Profits of power loss reduction ($) | 5.53 × | 4.06 × | 4.83 × | 4.16 × | Total profit of DSO ($) | 4.72 × | 4.88 × | 4.62 × | 5.01 × | Profit of CS service ($) | 0.58 × | 0.69 × | 0.65 × | 0.74 × |
|
|