Research Article
Short-Term PV Power Forecasting Using a Hybrid TVF-EMD-ELM Strategy
Table 3
Achieved results with different input data for studied models for the Ghardaia PV system.
| Input parameters/metrics | RMSE | nRMSE | nMAE | MABE | R (%) |
| PV−1 | 128.06 | 25.43 | 96.15 | 19.65 | 88.91 | PV−1–PV−2 | 124.23 | 24.67 | 90.52 | 18.35 | 89.53 | PV−1–PV−3 | 113.42 | 22.52 | 74.66 | 15.07 | 91.34 | PV−1–PV−4 | 108.81 | 21.60 | 68.02 | 13.77 | 92.09 | PV−1–PV−5 | 107.24 | 21.29 | 64.62 | 13.15 | 92.37 | PV−1–PV−6 | 107.015 | 21.24 | 65.25 | 13.33 | 92.45 | PV−1–PV−7 | 106.88 | 21.21 | 66.90 | 13.73 | 92.51 | PV−1–PV−8 | 106.72 | 21.19 | 67.17 | 13.77 | 92.52 | PV−1–PV−9 | 106.29 | 21.93 | 67.11 | 13.75 | 92.57 | PV−1–PV−10 | 106.73 | 21.18 | 67.30 | 13.74 | 92.47 | PV−1–PV−11 | 107.224 | 21.28 | 68.64 | 14.04 | 92.42 |
|
|