Short-Term PV Power Forecasting Using a Hybrid TVF-EMD-ELM Strategy
Table 6
Achieved results with different input data for studied models for Sidi Bel Abbes PV system.
| Input parameters/metrics | RMSE | nRMSE | nMAE | MABE | R (%) |
| PV−1 | 6770.32 | 27.720 | 5131.00 | 21.034 | 90.59 | PV−1–PV−2 | 5918.87 | 24.23 | 3635.63 | 14.89 | 92.84 | PV−1–PV−3 | 5642.91 | 23.099 | 3206.30 | 13.18 | 93.51 | PV−1–PV−4 | 5571.20 | 22.80 | 3132.00 | 12.87 | 93.68 | PV−1–PV−5 | 5497.10 | 22.49 | 3118.73 | 12.77 | 93.85 | PV−1–PV−6 | 5424.72 | 22.20 | 3093.78 | 12.65 | 94.02 | PV−1–PV−7 | 5342.29 | 21.86 | 3042.88 | 12.44 | 94.20 | PV−1–PV−8 | 5300.11 | 21.69 | 3030.17 | 12.38 | 94.30 | PV−1–PV−9 | 5269.46 | 21.56 | 3035.67 | 12.39 | 94.37 | PV−1–PV−10 | 5266.62 | 21.55 | 3037.15 | 12.38 | 94.37 | PV−1–PV−11 | 5274.95 | 21.59 | 3055.62 | 12.45 | 94.36 |
|
|