Research Article

Two-Stage Optimization Model of Centralized Energy Storage Participating in Peak Shaving with Maximum Reserve Capacity and Minimum Carbon Emission of the System

Table 4

Comparison of optimization results of different cases.

 Carbon emissions (t)BESS operation cost ($)Peak-valley difference (%)Load shedding risk cost ($)Wind power risk cost ($)Ramping cost of thermal power units ($)Total cost ($)

Case 19570.7390947.47219482647217721165750
Case 29314.3675542.45239022808222866178990
Case 39974.9663842.86207841686823188167230