Research Article
Fuzzy Logic Control of an Automatic Changeover for the Management of a Grid-Connected Photovoltaic System
| Time intervalley (s) | Irradiance (W/m2) | SOC (%) | Grid voltage (V) | Switch states: 1: closed, 0: open | Decision | Spv | Snet | Sbat |
| 0–50 | 755 | 25 | 220 | 1 | 0 | 0 | PV | 50–100 | 825 | 80 | 220 | 1 | 0 | 0 | PV | 100–150 | 900 | 90 | 50 | 1 | 0 | 0 | PV | 150–200 | 1000 | 99 | 0 | 1 | 0 | 0 | PV | 200–250 | 800 | 35 | 200 | 1 | 0 | 0 | PV | 250–300 | 700 | 35 | 24 | 1 | 0 | 0 | PV | 300–350 | 400 | 28 | 6 | 0 | 0 | 0 | OFF | 350–400 | 300 | 20 | 200 | 0 | 1 | 0 | GRID | 400–450 | 300 | 70 | 220 | 0 | 1 | 0 | GRID | 450–500 | 600 | 85 | 180 | 1 | 0 | 1 | PV + BATT | 500–550 | 800 | 100 | 180 | 1 | 0 | 0 | PV | 550–600 | 650 | 88 | 0 | 1 | 0 | 1 | PV + BATT | 600–650 | 500 | 98 | 0 | 1 | 0 | 1 | PV + BATT | 650–700 | 200 | 31 | 50 | 0 | 0 | 0 | OFF | 700–750 | 150 | 31 | 180 | 0 | 1 | 0 | GRID | 750–800 | 300 | 100 | 0 | 0 | 0 | 1 | BATT | 800–850 | 450 | 99 | 220 | 1 | 0 | 1 | PV + BATT | 850–900 | 660 | 32 | 220 | 0 | 1 | 0 | GRID | 900–950 | 900 | 30 | 70 | 1 | 0 | 0 | PV | 950–1000 | 380 | 15 | 30 | 0 | 0 | 0 | OFF |
|
|