Research Article

Fuzzy Logic Control of an Automatic Changeover for the Management of a Grid-Connected Photovoltaic System

Table 7

Batteries charging scenarios.

Time intervalley (s)Irradiance (W/m2)SOC (%)Grid voltage (V)Switch states: 1: closed, 0: openDecision
SbnetSbpv

0–507552522001PV
50–1008258022001PV
100–150900905001PV
150–200100099001PV
200–2508003520001PV
250–300700352401PV
300–35040028601PV
350–4003002020010GRID
400–4503007022010GRID
450–5006008518000NO
500–55080010018001PV
550–60065088000NO
600–65050098000NO
650–700200315000NO
700–7501503118010GRID
750–800300100000NO
800–8504509922000NO
850–9006603222010GRID
900–950900307001PV
950–1000380153000NO