Research Article
Providing a New Multiobjective Two-Layer Approach for Developing Service Restoration of a Smart Distribution System by Islanding of Faulty Area
Table 4
Second layer results from fault between buses 4 and 5.
| | Time | Optimal load planning | Nondispatchable resources planning | | SOC | Power (kW) | Bus | Network sections | | Load shedding | Load outage | | Power (kW) | Power (kW) |
| | 19:00 | 913.513 | — | — | 434.112 | Exchange | Section connected to the upstream | | 91.452 | 61.693 | ES20 | | 30 | −15.789 | ES5 | MG 1 | | — | 650 | MT29 | | 106.667 | 39 | ES14 | MG 2 | | — | 511.743 | MT15 | | — | 349.3 | MT18 | MG 4 |
| | 20:00 | 1012.724 | — | — | 515.188 | Exchange | Section connected to the upstream | | 40 | 46.307 | ES20 | | — | 650 | MT29 | MG 1 | | — | 554.394 | MT15 | MG 2 | | 30 | 69 | ES14 | | — | 338.7 | MT18 | MG 4 | | 40 | 54 | ES33 |
|
|