Research Article

Providing a New Multiobjective Two-Layer Approach for Developing Service Restoration of a Smart Distribution System by Islanding of Faulty Area

Table 5

Comparison of results with the study in [41].

 Execution time of layer 1 (s)Load shedding (kW)Number of MGNumber of switches

Proposed method11926.23748
Reference [41]15.32030.963212