Research Article
Multitask Oriented Virtual Resource Integration and Optimal Scheduling in Cloud Manufacturing
| (1) For 1 to // looped by columns | | (2) For 1 to //checked by rows | | (3) If , jump to Step 2; | | (4) Else | | If , jump to Step 2; | | Else | | If not existed the same non-zero number, jump to | | Step 2; | | Else | | Randomly selected a number from the difference | | set between the set and the current column | | value set to replay. If the difference sets is , then | | set ; | | (5) For End | | (6) For End |
|