Research Article
Production Planning of a Failure-Prone Manufacturing System under Different Setup Scenarios
Table 2
Setup times for machine tools (Boothroyd et al. [
15]).
| | Some nonproductive times for common machine tools | | Machine tool | Time to engage tool and so forth (s) | Basic setup time (h) | Additional setup per tool (h) |
| | Horizontal band saw | — | 0.17 | — | | Manual turret lathe | 9 | 0.15 | 0.2 | | NC turret lathe | 1.5 | 0.5 | 0.15 | | Milling machine | 30 | 1.5 | — | | Drilling machine | 9 | 1 | — | | Horizontal-boring machine | 30 | 1.3 | — | | Broaching machine | 13 | 0.6 | — | | Gear hobbling machine | 39 | 0.9 | — | | Grinding machine | 19 | 0.6 | — | | Internal grinding machine | 24 | 0.6 | — | | Machining center | 8 | 0.7 | 0.05 |
|
|