Research Article
Optimal Corridor Selection for a Road Space Management Strategy: Methodology and Tool
Table 4
Solution for the small city network.
| | Case | System level performance measures | | Performance measure | Value |
| | Base-case: no improvements | TSTT (veh-min) | 389,365 | | Average link speed | 26 mph | | TSCC () | 357,771,000 | | Improvement cost | 0 |
| | Optimal solution (from multiple solutions) | TSTT (veh-min) | 262,952 +[32%] | | Average link speed | 31 mph +[19%] | | TSCC () | 365,726,685 –[2%] | | Improvement cost | 10,578 | | Budget | 20,000 |
|
|
+ sign next to the value means positive outcome relative to the base-case. − sign means a negative outcome compared to the base-case.
|