Research Article
A Case Study on the Impacts of Connected Vehicle Technology on No-Notice Evacuation Clearance Time
Table 4
Data collection and sources [
56].
| Data | Purpose | Sources | Remarks |
| Aerial images | Creating network | Geographic Department (SIUE) and Google Website | Used as a base for the model | Chain of rocks canal bridge | Ensuring the network reflects post 2014 | IDOT and MODOT approved design plans | Completed but not updated in aerial images | Current traffic volumes | Model calibration | IDOT website | For 24 km segment of I-55, 70 | Traffic signal timing | Network modeling | IDOT-District 8 and site visits | Traffic Control | Trip O/D matrices | Loading the network with traffic volumes | Regional Planning Agency (EWGCOG) | Reflecting the evacuation volumes for base year | Travel times | Model calibration | Site visits | For 24 km segment of I-55/ I-70 | Queue lengths | Model validation | Site visits | Routes 157 & 159 | Truck percentage | Traffic distribution | Site visits | Segments of I-55, 70, and I-64 | Stop signs | Network modeling | Site visits | Traffic control |
|
|