Research Article
Compressive Strength Gain Behavior and Prediction of Cement-Stabilized Macadam at Low Temperature Curing
Table 3
The “Temperature × Time” data for each position (°C·h).
| Location curing days (d) | Upper | Middle | Bottom | Central |
| 7 | 2057 | 1727 | 1427 | 1690 | 8 | 2360 | 1987 | 1641 | 1946 | 9 | 2660 | 2247 | 1853 | 2200 | 10 | 2965 | 2515 | 2068 | 2462 | 11 | 3265 | 2779 | 2280 | 2719 | 12 | 3569 | 3045 | 2498 | 2979 | 13 | 3877 | 3315 | 2720 | 3246 |
|
|